LIST OF PRESTIGIOUS EPC JOBS

Sr.No EPC Project Client Contract Value (Rs.Lacs) Compln Date
1 EPC PACKAGE FOR BALANCE OF PLANT (BOP)FOR ANSALDO PROJECTS 8900 OCT. 2005
  2 x 210 MW FOR NEYVELI LIGNITE LIMITED, ITALY & ELECTRICAL LIMITED,ITALY    
  POWER STATION      
2 SUPPLY, FABRICATION, ERECTION, TESTING AND COMMISSIONING RASHTRIYA ISPAT 3121.88 UNDER PROGRESS
  OF "EXPANSION OF VSP 6.3 MTPY LIQUID STEEL CAPACITY NIGAM LIMITED    
  - OUTDOOR PIPELINE (ODPL) AND ASSOCIATED STRUCTURAL VISAKHAPATNAM STEEL    
  STEEL WORK FOR ROLLING MILLS AREA", AT VISAKHAPATNAM PLANT,VISAKHAPATNAM    
  VISAKHAPATNAM, A.P.      
3 SUPPLY, ERECTION, TESTING AND COMMISSIONING OF BALAJI DISTILLERIES LTD. 2787 MAR. 2003
  COMPLETE PLANT AND MACHINERY FOR BREWERY PROJECT CHENNAI    
  AT CHENNAI ARANVOYAL IN TAMILNADU.      
4 SUPPLY, ERECTION & COMMISSIONING OF GOVT. OF INDIA, 620.2 UNDER PROGRESS
  EQUIPMENTS IN MIXING STATIONS & BOWL DEPARTMENT OF SPACE,    
  CLEANING & PREPARATION FACILITIES AND SATISH DHAVAN SPACE    
  PREMIX STORAGE FACILITY AT SDSC, SHAR, CENTRE, SHAR,    
  SRIHARIKAOTA SRIHARIKAOTA    
    ANDHRA PRADESH    
5 SUPPLY, FABRICATION, ERECTION, INSPECTION NUCLEAR POWER 539.69 NOV. 2005
  TESTING OF AUXILIARY SERVICE WATER (ASW) CORPORATION OF INDIA    
  SYSTEM FOR TAPP-3 & 4 AT TARAPUR IN LTD.,TARAPUR    
  MAHARASHTRA      
6 SUPPLY, ERECTION, TESTING AND COMMISSIONING OF NUCLEAR POWER 569 APR. 1999
  APW / APCW PIPING PACKAGE FOR UNIT 1&2 AT CORPORATION OF INDIA    
  KAIGA IN KARNATAKA LTD.,TARAPUR    
7 SUPPLY, ERECTION, TESTING AND SYNTHETICS & CHEMICALS 563.1 AUG. 1996
  COMMISSIONING OF VARIOUS EQUIPMENT Ltd. MUMBAI    
  AND ITEMS INCLUDING CIVIL WORKS FOR      
  NLP/SBR V PLANTS AND OFFSITES AT      
  BAREILLY IN U.P.      
8 SUPPLY OF MATERIAL, BOQ FINALISATION AND ERECTION FLOAT GLASS INDIA LTD. 800 NOV.1994
  OF MAIN PLANT, OFFSITES AND UTILITIES PIPING AT MUMBAI    
  TALOJA IN MAHARASHTRA      
9 DESIGN, ENGINEERING, SUPPLY, ERECTION AND OIL &NATURAL GAS 662.46 MAR. 1987
  COMMISSIONING OF CIVIL, MECHANICAL, PIPING, ELECTRICAL, COMMISSION,HAZIRA    
  INSTRUMENTATION, HAZIRA AIRCONDITIONING ETC.      
  AT HAZIRA GAS TERMINAL IN GUJARAT      
10 a) DESIGN, SUPPLY, INSPECTION, TESTING MAHINDRA & MAHINDRA 575 JAN.2000
  AND COMMISSIONING OF TOTAL LTD. MUMBAI    
  COMPRESSED AIR SYSTEM OF CAPACITY      
  3800 CFM AT 7.5 KG PRESSURE, INCLUDING      
  COOLING WATER SYSTEM FOR COMPRESSOR      
  AT NASIK IN MAHARASHTRA      
         
  b) SUPPLY, FABRICATION, ERECTION, TESTING      
  AND COMMISSIONING OF FIRE FIGHTING      
  SYSTEM AS PER TAC NORMS AT NASIK      
  AND IGATPURI, DISTRIBUTION SYSTEM FOR      
  FORD-MAHINDRA AND MAHINDRA &      
  MAHINDRA AT NASIK IN MAHARASHTRA      
         
  c) COMPLETE PLANT ELECTRIFICATION FOR      
  PAINT SHOP AND 5 OTHER SHEDS, GENERAL      
  LIGHTING AND STREET LIGHTING AT NASIK      
  IN MAHARASHTRA.      